Kia EV2 is 270 mm (10.6 in) shorter than BYD Atto 2 DM-i.
Kia EV2 is 100 mm (3.9 in) lower than BYD Atto 2 DM-i.
Kia EV2 has a wheelbase 55 mm (2.2 in) shorter than BYD Atto 2 DM-i.
Blue solid line: BYD Atto 2 DM-i; orange dashed line: Kia EV2.The outlines are generic body shapes drawn at one scale, not the real design of any model.
BYD Atto 2 DM-i is 4,330 mm (170.5 in) long and 1,675 mm (65.9 in) high, with a wheelbase of 2,620 mm (103.1 in). Kia EV2 is 4,060 mm (159.8 in) long and 1,575 mm (62 in) high, with a wheelbase of 2,565 mm (101 in).
Kia EV2 is 30 mm (1.2 in) narrower than BYD Atto 2 DM-i.
Blue solid line: BYD Atto 2 DM-i; orange dashed line: Kia EV2.
BYD Atto 2 DM-i is 1,830 mm (72 in) wide and 1,675 mm (65.9 in) high. Kia EV2 is 1,800 mm (70.9 in) wide and 1,575 mm (62 in) high.
Blue solid line: BYD Atto 2 DM-i; orange dashed line: Kia EV2.
BYD Atto 2 DM-i is 1,830 mm (72 in) wide and 1,675 mm (65.9 in) high. Kia EV2 is 1,800 mm (70.9 in) wide and 1,575 mm (62 in) high.
Compare specifications
A check mark shows the better value in a row. Range and efficiency check marks compare only values from the same test cycle. Prices are each market's own list prices, compared within that market; some include tax and some do not, and no price is marked better when the tax treatment differs. Energy cost is what the energy for 100 km (100 mi where the market uses miles) costs at the market's latest published national energy price, in its own currency, with the price's source and date.
Specification comparison
Specification
BYD Atto 2 DM-i
Kia EV2
Price
Base priceUnited States
Neither car has a price listed for United States yet.
CA$1.64per 100 kmDerivedElectricity at CA$0.12 per kWh, excl. tax, for 1 Jan 2025 to 31 Dec 2025. Derived: usable battery divided by rated range, from the WLTP range. It is battery to wheels, so it is usually lower than an official figure. Statistics Canada, table 25-10-0021-01 for Canada electricity price
NOK 30.59per 100 kmDerivedElectricity at NOK 2.226 per kWh, incl. tax, for 1 Jan 2026 to 30 Jun 2026. Derived: usable battery divided by rated range, from the WLTP range. It is battery to wheels, so it is usually lower than an official figure. Eurostat household electricity prices (nrg_pc_204) for Norway electricity price
Energy cost per 100 kmFrance
–Not available
€3.41per 100 kmDerivedElectricity at €0.249 per kWh, incl. tax, for 1 Jan 2026 to 30 Jun 2026. Derived: usable battery divided by rated range, from the WLTP range. It is battery to wheels, so it is usually lower than an official figure. Eurostat household electricity prices (nrg_pc_204) for France electricity price
Energy cost per 100 kmSpain
–Not available
€3.45per 100 kmDerivedElectricity at €0.251 per kWh, incl. tax, for 1 Jan 2026 to 30 Jun 2026. Derived: usable battery divided by rated range, from the WLTP range. It is battery to wheels, so it is usually lower than an official figure. Eurostat household electricity prices (nrg_pc_204) for Spain electricity price
Energy cost per 100 kmItaly
–Not available
€4.32per 100 kmDerivedElectricity at €0.314 per kWh, incl. tax, for 1 Jan 2026 to 30 Jun 2026. Derived: usable battery divided by rated range, from the WLTP range. It is battery to wheels, so it is usually lower than an official figure. Eurostat household electricity prices (nrg_pc_204) for Italy electricity price
SEK 45.39per 100 kmDerivedElectricity at SEK 3.304 per kWh, incl. tax, for 1 Jan 2026 to 30 Jun 2026. Derived: usable battery divided by rated range, from the WLTP range. It is battery to wheels, so it is usually lower than an official figure. Eurostat household electricity prices (nrg_pc_204) for Sweden electricity price
Energy cost per 100 kmDenmark
–Not available
DKK 24.39per 100 kmDerivedElectricity at DKK 1.775 per kWh, incl. tax, for 1 Jan 2026 to 30 Jun 2026. Derived: usable battery divided by rated range, from the WLTP range. It is battery to wheels, so it is usually lower than an official figure. Eurostat household electricity prices (nrg_pc_204) for Denmark electricity price